Tribe: Campo Band of Mission Indians
View Source Document: Campo Climate Adaptation Action Plan
Year: 2018
Topic: Strategies for riparian area augmentation/groundwater recharge (View All Topics in the Plan)
Removal of siltation accumulation from the CCC dam south of SR 94 will allow for greater storage at this water...
Contaminated water at the southern 100 acre fee site could be pumped out to generate planting sites for oaks and...
As indicated above, monitoring wells drawdown and its relation to creek desiccation should be a priority for not only woodland...
Out planting sites of Elderberry (Sambucus Nigra) on the periphery of Oak Woodlands or in marginal drainages without Oak Woodlands...
More rock and wire gabions should be installed in valley drainages to raise the groundwater level and vadoze in suitable...
The installation of micro infiltration basins and over flow devices would enhance groundwater infiltration also.
Tamarisk (Tamarix ramosissima) removal should be a priority at Diabold Sand Plant and elsewhere on the reservation to prevent the...