Topic: Strategies for riparian area augmentation/groundwater recharge (View All Topics in the Plan)

Associated Climate Resilience Actions:
Campo Band of Mission Indians

Removal of siltation accumulation from the CCC dam south of SR 94 will allow for greater storage at this water...

Ecosystems Water
Campo Band of Mission Indians

Contaminated water at the southern 100 acre fee site could be pumped out to generate planting sites for oaks and...

Ecosystems Water
Campo Band of Mission Indians

As indicated above, monitoring wells drawdown and its relation to creek desiccation should be a priority for not only woodland...

Ecosystems People
Campo Band of Mission Indians

Out planting sites of Elderberry (Sambucus Nigra) on the periphery of Oak Woodlands or in marginal drainages without Oak Woodlands...

Ecosystems
Campo Band of Mission Indians

More rock and wire gabions should be installed in valley drainages to raise the groundwater level and vadoze in suitable...

Ecosystems Water
Campo Band of Mission Indians

The installation of micro infiltration basins and over flow devices would enhance groundwater infiltration also.

Ecosystems Water
Campo Band of Mission Indians

Tamarisk (Tamarix ramosissima) removal should be a priority at Diabold Sand Plant and elsewhere on the reservation to prevent the...

Ecosystems