Skip to content
Tribal Resilience Action Database

Tribal Resilience Action Database

  • Home
  • About Us
  • All Tribe Plans
  • Feedback
  • Search Actions
  • My Saved Actions

Install, reengineer or conduct preventative maintenance on retaining walls, drainage systems, water storage tanks, stormwater retention basins, culverts, storm systems, porous surfaces, etc. The Utilities Department is working with Pala Casino Spa & Resort, PED, and the Tribal Services and Housing Departments using tribal and partner funds to conduct this strategy on an ongoing basis. Recent accomplishments include working with San Diego County to install several culverts along Pala Temecula Road to avoiding flooding which has closed the road in the past and working with Caltrans to widen the old SR-76 bridge. Additional needs are outlined in Pala’s 2016 Hazard Mitigation Plan.

Tribe: Pala Band of Mission Indians

View Source Document: Climate Change Adaptation Plan

Year: 2019

Topic: Infrastructure Improvement Strategies (view all topics in the plan)

Climate Hazards

Decreasing Water Quality
Decreasing Water Quantity
Flooding - Rainfall-induced
Vector-borne disease

Assets

Water Infrastructure - Drinking Water
Water Infrastructure - Stormwater

Types

Capital Improvements - Green & Gray Infrastructure
Land Use, Land Conservation, & Zoning

© 2026 Tribal Resilience Action Database All Rights Reserved
Powered by Valice