Develop a Tribal Transportation Safety and Resilience Plan. The Business Office is working with PED and consultants using BIA funds to supplement the existing TTSP by 2022. PED has been awarded SB-1 funding from Caltrans to expand this project to more deeply evaluate, strengthen, and expand infrastructure (roads, bridges, etc.) and systems (transit) and build transportation resilience in preparation for extreme events. Such a plan can increase Pala’s capacity to integrate climate change considerations into material requirements, infrastructure design, and improvements, as recommended by the CA Fourth Climate Assessment: San Diego Report.
